Council facilities · Battery storage

Council battery storage for waste facilities, treatment plants, pools and depots

Smaller peaks, more of your own solar, and a study your procurement team can use.

Council sites pay for their peaks. A few high-demand intervals from a leachate plant, a recycling line or a pool plant room can set the network demand charge for the whole month. A battery sized to your load profile shaves those peaks, stores midday solar for the evening, and gives your net zero plan a measured result.

  • Go/no-go in 5 business days
  • Fixed-fee study you own
  • Training included

Where a battery earns its keep

Waste and resource recovery

Recycling lines, leachate treatment, composting fans, weighbridges

Shaves peaks, stores solar, supports planned expansions

Water and sewage treatment

Pumps, aeration blowers

Shaves peaks, runs pumps on stored solar or off-peak energy, backs up selected critical loads where the design allows

Aquatic and leisure centres

Heating, filtration, lighting

Cuts demand charges, lifts solar self-use

Depots and fleets

Electric vehicle and truck charging

Buffers charging peaks and can defer a connection upgrade

Community batteries

Shared storage for local rooftop solar

Soaks up midday solar for the neighbourhood

Your options compared

Doing nothing, solar only, a battery you own, and a battery as a service, side by side.

Council battery options compared
OptionDo nothingSolar onlyBattery you own (with Edisonic)Battery as a service
Upfront costNoneSolar capitalBattery capital, less any incentive the site qualifies forNone or low
Equipment ownerNo new equipmentCouncilCouncilThe provider
Battery riskNo batteryNo batteryCouncil, backed by the manufacturer warranty, with Edisonic managing claims locallyThe provider
Peaks after sunsetUnchangedUnchangedShavedShaved, or priced into the plan
SavingsNoneDaytime energy, kept by councilKept by councilShared with the provider
ContractNoneNoneNone after handover; monitoring and O&M by choiceUsually a multi-year term

Service plans vary by provider, site size and network area. The feasibility study models the owned option for your site.

The NSW business battery incentive (BESS5)

Since September 2026, the NSW Peak Demand Reduction Scheme has included business batteries (activity BESS5). The NSW Government says the discounts cut the upfront cost of batteries by around 20 to 40 per cent. Details: NSW Government

We check site and product eligibility in the feasibility study, and we'll tell you early if the incentive doesn't apply. Details: NSW Climate and Energy Action.

BESS5 rules
RuleDetail
WhereBehind the meter at a business site. Residential buildings and data centres are excluded
SizeUsable capacity above 200 kWh and up to 30 MWh; incentives apply up to 10 MWh
How oftenOnce per site
How it's paidCertificates, created through an accredited certificate provider
Product rulesThe battery must meet safety testing and warranty requirements

Built for council procurement

  • The go/no-go costs nothing and commits you to nothing.
  • The feasibility study is a fixed fee, so it goes through your normal quotation process.
  • In NSW, contracts under $250,000 including GST are exempt from the Local Government Act tendering requirements and follow your council's own procurement policy (OLG guidelines). For larger projects, we respond to your tender.
  • The study gives your approval process what it needs: a business case with modelled payback, incentive eligibility, fire safety and siting considerations, the network connection pathway and a procurement-ready specification.

Waste facilities: start with your own load

If a contractor runs the landfill gas engines on your site, the gas side is theirs. The weighbridge, leachate plant, recovery sheds and any recycling or composting plant are yours, and so is the demand charge they set. That's the load we look at first.

How the free go/no-go works

Community batteries

The federal Community Batteries for Household Solar program ($200 million for around 400 batteries) has funded councils and networks to install shared batteries (DCCEEW). If your council is weighing a community battery, we can size it and build the technical case for a funding application.

  • 12 months of interval data for the site's meter (NMI). Your retailer or network can export it as a CSV.
  • Your last two electricity bills.
  • Any solar on site: size and age.
  • Planned changes: expansions, new equipment, fleet charging.

Site savings estimator

Want a rough number first? The site savings estimator has presets for councils, mine sites and remote communities.

Open the calculator

Council FAQs

Can a NSW council buy a battery without going to tender?

Contracts under $250,000 including GST are exempt from the tendering requirements in section 55 of the Local Government Act and follow your council's procurement policy. Contracts at or above that value go to tender unless another exemption applies, such as buying from a Local Government Procurement contract.

Does the BESS5 incentive apply to council sites?

It applies to behind-the-meter batteries at business sites and excludes residential buildings and data centres. Operational sites such as depots, treatment plants and waste facilities may qualify. Eligibility depends on the site and the product, and we confirm both in the study.

What data do you need?

Twelve months of interval data for the site's meter, your last two bills, and details of any solar. Your retailer or network can export the interval data as a CSV.

How long does the go/no-go take?

Five business days from when we receive your data.

Are batteries safe at waste facilities?

Our systems use LFP cells with liquid cooling and built-in fire suppression. Siting and separation from stockpiles are designed with your fire engineer and your consent conditions.

Can a battery keep critical loads running in an outage?

Where the site design allows, selected critical loads can be backed up. We confirm what's possible for your site in the study.

Should a council own its battery or buy it as a service?

Owning keeps the savings, and any incentive benefit, with council. A service plan avoids the upfront cost, shares the savings with the provider and usually runs for several years. The comparison table above sets out the trade-offs, and the study models the owned option for your site.

Find out if a battery stacks up at your site. One page, five business days, no cost.