Battery storage project delivery

From feasibility and system selection to equipment supply, commissioning and ongoing support. Start with the help you need, then agree the scope and responsibilities.

Choose the support your project needs

Equipment supply

For projects with a defined specification. Discuss cabinets, containers, integration requirements and product documentation.

Feasibility and project development

For sites assessing a battery or refining a project. Start with load or fuel analysis, sizing and the connection pathway.

Commissioning and support

Agree installation supervision, commissioning, operator training and ongoing support for your system.

Installation, civil works, network approvals and ongoing operations are confirmed in the project scope, including which responsibilities sit with Edisonic, delivery partners and your team.

From first assessment to lifecycle support

Project stages and costs
StageWhat happensCost
1. Go/no-goOne page from your interval data or fuel records, within five business daysNo cost
2. Feasibility studyLoad, tariff or fuel analysis, sizing, cycling strategy, payback, incentive eligibility, connection pathwayFixed fee
3. Compliance and connectionNetwork application, protection settings, documentationScoped in the study
4. SupplyIntegrated, pre-configured system, landed and delivered to siteQuoted after the study
5. Delivery and commissioningInstallation supervision and commissioningQuoted after the study
6. Training and monitoringOperator training, monitoring, O&M and warranty managementTraining included; monitoring and O&M by agreement
7. LifecycleCapacity testing, augmentation, spares and end of lifeBy agreement

What you own. The feasibility study, its model and its specification are yours.

Large projects are staged, with milestone payments tied to factory release, shipment and commissioning.

Find out if a battery stacks up at your site. One page, five business days, no cost.